Work begins on foot overbridge near Delhi’s Rajputana Rifles HQ

56

New Delhi: The Public Works Division (PWD) has began work for the development of a everlasting foot overbridge (FOB) close to the Rajputana Rifles headquarters alongside Ring Street, near the make-shift “Bailey’s bridge” made after a report by PR highlighted how 1000’s of troopers are compelled negotiate a smelly culvert because of the absence of a secure crossing, officers conscious of the event mentioned on Thursday.

New Delhi, India – Feb. 22, 2026: A view of foot over bridge development website at Rajputana Rifles Regiment centre Delhi Cantonment in New Delhi, India, on Sunday, February 22, 2026. (Photograph by Vipin Kumar/ The Press Reporter) (The Press Reporter)

The undertaking, which has been pending for over a decade, is predicted to be accomplished inside six months. Heavy equipment has been deployed and huge trenches have been dug to put the muse for the construction.

The FOB being constructed shall be a primary pedestrian bridge and won’t have escalators or lifts.

“Excavation and basis work has began on the website adjoining to the Bailey’s bridge that was put in as a short lived measure final yr. As soon as the muse work is accomplished, we are going to begin work on the primary construction. Some visitors restrictions could also be wanted in a number of months,” mentioned an official.

Additionally Learn | ₹177 crore for stormwater drain revival in Delhi”>PWD set to spend 177 crore for stormwater drain revival in Delhi

The positioning falls close to the Rajputana Rifles campus in Delhi Cantonment, the place troopers and trainees cross Ring Street every day to maneuver between their barracks and coaching grounds. Within the absence of a everlasting FOB, they have been earlier compelled to cross a drain culvert positioned close to the carriageway. The culvert, which carries stormwater runoff, regularly overflows through the monsoon season, making the crossing troublesome and unsafe.

In Might final yr, The Press Reporter had reported that troopers of the Rajputana Rifles regiment have been negotiating the culvert a number of occasions a day to achieve their parade floor, regardless of the FOB having been permitted years earlier.

On Might 26, PR highlighted that 1000’s of troopers of the regiment, one of many oldest rifle regiments of the Indian Military, crossed the culvert 4 occasions every day, twice earlier than breakfast and twice after nightfall, because of the absence of a secure pedestrian crossing.

In the course of the monsoon, the state of affairs worsened because the culvert crammed with rainwater runoff. Trainees have been both required to wade by means of waist-deep drain water or take a detour of greater than 2.5 kilometres alongside Ring Street to cross from one facet of the carriageway to the opposite.

Data accessed by PR confirmed that the FOB had earlier obtained approval in 2010. Nevertheless, regardless of the clearance being granted practically 15 years in the past, the construction was by no means constructed and the undertaking was finally scrapped.

After PR’s report final yr, the Delhi Excessive Court docket took suo motu cognisance of the difficulty and directed the involved companies to make sure development of the FOB. When the PWD knowledgeable the court docket that the everlasting construction would take a minimum of a yr to finish, the court docket recommended the development of a short lived Bailey’s bridge to supply rapid reduction.

Performing on the suggestion, a Bailey’s bridge was erected inside a fortnight and has been operational since October. With the graduation of basis work this week, officers mentioned the everlasting FOB will now substitute the short-term association. As soon as the FOB is accomplished, the Bailey’s bridge shall be dismantled.